Overlay or full dig-out: how we decide

Before we lay resin, we have to decide what goes underneath it. Either we lay it straight over what you have now (an overlay), or we dig out and build a new base (a full dig-out). This is usually the biggest single thing that sets the price, so here’s how we decide.

Get my free estimate Call 01792 550090

Not sure which you need? Send a photo with the estimate form and we’ll tell you.

Overlay: laying resin over your existing surface

Worn tarmac driveway beside a brick bay window before the resin overlay
Before: worn tarmac
The same driveway after a light grey resin bound overlay
After: resin overlay

An overlay is the quicker, lower-cost option. The resin follows the shape of the surface that’s already there, so it suits sound concrete or tarmac drives, slabbed paths and patios.

When an overlay works

  • The surface is solid, with no sinking, loose areas or widespread cracking.
  • There’s a properly compacted sub-base underneath, at least 150 mm of Type 1, so the finish lasts.
  • Small cracks and potholes can usually be repaired and reinforced with Helibar and extra resin bound stone first.

Things to know

  • Rain still drains through the resin, but then runs off the old surface below, much as it does now. So an overlay isn’t fully permeable.
  • The 18 mm layer should meet walls or existing edging stones. We don’t use aluminium angle edging on an overlay, because it can move underfoot and crack the edge over time.
  • We don’t overlay block paving or bricks laid on sand. The blocks can move, so they need lifting and a proper base building up first.

Full dig-out: a new base from the ground up

Side garden path before work: lawn with uneven stepping stones
1. Before: lawn and stepping stones
Compacted MOT Type 1 sub-base with new block edging along the path
2. Compacted sub-base and edging
MeshEase reinforcement mesh laid over the compacted base
3. MeshEase grid laid
The finished resin bound path with grey block edging
4. Finished resin path

If the ground is sinking, or it’s grass, loose stone or a mix of surfaces, we dig it out and start again. It costs more, but it fixes the ground for good.

What a full dig-out involves

  1. Dig out and build the base. We excavate and lay at least 150 mm of compacted MOT Type 1 sub-base.
  2. Raise covers to the new level. Manholes and gullies are reset to match the finished surface.
  3. Set the edges. Open edges get a solid stone or block edging set in concrete, including the line between your drive and the pavement. Raised planters or retaining walls are built at this stage too.
  4. Reinforce. Paths and patios get a recycled plastic grid or a fibre mesh. Most driveways get a 65 mm layer of porous tarmac.
  5. Lay the resin. Then the 18 mm resin bound stone goes down. Contrasting borders and patterns are set out with aluminium edging.

Why it’s worth it

  • We can change levels and falls, so water goes where it should.
  • The whole surface is permeable, so it meets SuDS rules and usually needs no planning permission.
  • It’s built to last 15 years or more.

Sloping drives

On a slope we usually recommend 65 mm of porous tarmac over the reinforcement before the resin goes on, whichever base you start with.

What affects the price of a resin driveway · See more of our work and reviews

Get an estimate for your area

Tell us roughly how big the area is and what’s there now. A photo helps us say whether it’s an overlay or a dig-out. We’ll email your free estimate, usually the same working day.

Get my free estimate Call 01792 550090

Free Online Estimate