Erinstone lays permeable resin bound paving for the public pedestrian realm across South Wales: the forecourts and entrance plazas of museums, leisure centres, shopping centres and civic buildings, public squares, and the walkways, cycle paths, ramps and bridges on new developments. Rainwater drains straight through the surface. The finish is smooth, joint-free and flush with the kerbs, thresholds, paving and inspection covers it meets, so it’s good for step-free access. We’re a Swansea company and we work with architects, landscape architects, housebuilders, developers, quantity surveyors, main contractors and council public-realm teams across South and West Wales.

Who it’s for
- Architects and landscape architects who want a permeable, seamless surface for a public space or building entrance.
- Housebuilders and developers surfacing driveways, walkways, cycle paths, slopes and ramps, shared pedestrian areas and bridges.
- Quantity surveyors and estimators who need a clear, itemised price from drawings and a build-up that matches the specification.
- Main contractors who need a surfacing contractor who works to their programme and site rules.
- Council public-realm officers improving squares, forecourts and town-centre streets.



Where it’s used
- Forecourts and entrance plazas at museums, leisure centres, shopping centres and civic buildings
- Civic squares and other public spaces in town and city centres
- Walkways and footpaths through developments, parks and public spaces
- Cycle paths and shared paths for walking and cycling
- Slopes and ramps, including level and step-free entrances
- Bridges on paths and developments
- Around trees and planting, including tree pits
Colours, borders and logos can be set into the surface to mark entrances, routes and zones.






For play areas, running paths and bike paths that need a little more give, see RubbaStone, our own rubber surface.
SuDS and drainage
Resin bound stone is permeable. On a free-draining base, rain soaks through where it falls instead of running off into gullies and drains.
In Wales, most new developments need approval from the local SuDS Approving Body (SAB) before construction starts. That’s normally any scheme of more than one house, or with a construction area of 100 m² or more. The SAB checks that surface water is managed within your site rather than piped into the sewer or onto the road. On the right build-up, a permeable resin surface can reduce or remove the need for gullies, channel drains and soakaway crates. We can talk you through the build-up for your site and help with the information the SAB asks for. Read our SuDS guide · Swansea Council: sustainable drainage


Build-ups we use
We work with your groundworks team to get the right build-up for each area, from the sub-base up.
- Resin on porous asphalt. Resin bound stone laid on porous asphalt over a compacted, free-draining sub-base. The whole build-up is permeable.
- aRBee reinforcement. For pedestrian areas, an aRBee MeshEase layer (a single reinforcing mesh) or PlyCore (30 mm of resin bound stone sandwiched between two layers of mesh) on a compacted sub-base.
- Over your specified asphalt. If your specification dictates asphalt, we can overlay that too.
- Overlay. Where an existing path or forecourt is sound, resin can go straight over it. The surface then drains into the old layer, so the area isn’t fully permeable.
Every batch is mixed on site from dried stone and at least 7% UV-stable resin and laid to 18 mm as standard. Where heavy vehicles use the area, we lay 22 mm on request.
Tested strength. We use LeesonBound UV-stable resin, covered by BBA Agrément Certificate 17/5413. In Leesons’ lab tests (report LTR 3892), 27 of our blends reached a flexural (bending) strength of 2.7 to 3.4 MPa, above FeRFA’s recommended 2 MPa minimum, and all are rated Low Slip Potential on the wet pendulum test; and PlyCore, with mesh top and bottom, averaged 8.4 MPa. Test reports are available on request.
A step-free, flush, joint-free finish
Resin bound stone is trowelled smooth into one continuous surface. There are no joints to trip on, no loose stones to scatter, and no gaps for weeds to root in. We lay it flush with whatever it meets: kerbs, thresholds, existing paving and inset inspection covers. That leaves no lips or upstands at the edges, which makes it good for step-free access and easy going for wheelchairs, buggies and anyone wheeling a bike or a case.
On slopes and ramps, we lay to the falls set by the designer, and the surface carries on without a joint from the path to the door.


Working with contractors and designers
- Samples. Ask for samples of the blends and colours you’re considering, so the design team and client can see the finish before it’s specified.
- Specification support. We’ll help with the build-up and the surfacing details for your drawings and specification, and talk through edges, levels and falls with your designer.
- Programme. We agree the build-up, programme and access with you, including phased areas and working around opening hours on live sites.
Accessible pedestrian surfaces for public buildings
Front approaches, paths and ramps at museums, leisure centres, shopping centres, care settings and schools need surfaces people can trust in the wet, and that wheelchairs and scooters can roll over without catching in open joints. Erinstone lays resin bound stone flush to thresholds and edgings, with glass grit as standard and blends tested for slip resistance (Low Slip Potential category). SuDS-permeable build-ups are available for pedestrian realm schemes across South Wales.
Flush, joint-free routes
Continuous resin bound surfaces that butt up flush, with fewer lips and open joints for wheels and sticks.
Grip and clear edges
Tested Low Slip Potential blends, glass grit as standard, and high-contrast step nosings where levels change.
Low maintenance and SuDS
A durable pedestrian finish with permeable options suited to public realm drainage goals.


Discuss a site visit or call 01792 550090.
How a commercial job runs
- Send us your plans or drawings through the commercial quote form, or email them to sales@erinstone.co.uk.
- We price from the drawings and visit the site if needed.
- We agree the build-up, programme and access, including working around opening hours.
- We lay and hand over. Areas can usually take foot traffic after about 4 hours.
Laying needs dry weather and a temperature of 5°C or above, so winter programmes allow for weather days.
Commercial work we’ve done
- Swansea: work at a public park (2023).
- Pontypridd: a resin bound path through a crematorium memorial garden (September 2019).
- Splott, Cardiff: resin bound stone on the high-level walkways and balconies of a new block of flats, for a commercial developer (October 2025).
- Porthcawl: resin bound surfacing at a water sports centre.
- Swansea city centre: public paving and a shop frontage.
- Supermarket: resin bound pedestrian walkways.
- Landore, Swansea: a resin overlay of about 40 m² at a park-and-ride site, with landscaping (2023).
- Swansea city centre: about 34 m² at a dental practice (2017).
- Bryncethin, Bridgend: surfacing at a charity site (2019).
- Aberystwyth: a job for a landscaping firm (2022).
- England: a commercial job of about 360 m² (2022).
- Bristol: driveways on a housing development.



“Erinstone have done a fantastic job on our development and we would have no problems in recommending Erinstone to anyone in the future for doing their driveways.”
FAQ
Is resin bound paving SuDS compliant?
Resin bound stone is permeable, so on a free-draining base rainwater drains through it into the ground. Whether a scheme meets the Welsh SuDS standards depends on the whole drainage design and on approval from the SuDS Approving Body. We can’t promise approval, but we can help with the build-up and the information the SAB asks for.
Can it be laid flush with kerbs, thresholds and inspection covers?
Yes. We lay resin bound stone flush with kerbs, door thresholds, existing paving and inset inspection covers, so there are no lips or upstands. The surface is smooth and joint-free, which makes it good for step-free access.
Can you lay it on ramps, slopes, cycle paths and bridges?
Yes. We lay to the falls set by your designer and agree the build-up for each area. On bridges, we agree the build-up for the deck with the designer before we price.
Can you work around a live site or opening hours?
Yes. We can phase the work and plan around opening hours. Areas can usually take foot traffic after about 4 hours. Laying needs dry weather and 5°C or above, so winter programmes allow for weather days.
Can you send samples and help with the specification?
Yes. Ask for samples of the blends and colours you’re considering, and we’ll help with the build-up and surfacing details for your drawings and specification.
How do I get a price?
Send your plans or drawings through the commercial quote form or call 01792 550090. We price from the drawings and visit the site if needed.
Send us your plans
Attach drawings or photos and we’ll come back to you, usually within 1–2 working days.
